Our Projects
Nyrstar Slag Caster Fume Hoods Modification
AEP Elical was engaged to undertake detailed design for modifications to the slag caster fume hoods. These modifications were required to provide clearance for a launder cleaning machine to be transported via the Monorails to/from the new northern and southern platform via the new launders.
Nyrstar Launder & Tapping Floor Upgrade Project
AEP Elical was engaged to undertake a structural assessment of Hatch designs for the new launder and tapping floor (replacing the plant installed during Transformation). Later on, AEP was engaged to undertake additional scope including design of the fishtail walkways, new southern and northern laydown platforms, and clash checks for the monorail system.
Nyrstar Slag Caster Frame Replacement
AEP Elical was engaged to undertake a concept study, followed by detailed design of structural modifications required to provide access for slag removal under the Slag Caster tail end support frame. As part of this project, AEP Elical undertook a structural integrity audit for the TSL Slag Caster Support Structure as well as additional scope in replacement of existing primary beam in the TSL plant and shedder plates to lengthen design life.
Nyrstar Slag Caster Discharge Chute
Nyrstar Port Pirie (Nyrstar) engaged AEP Elical to undertake Concept Design and Detailed Engineering Design for the Slag Caster Bin Discharge Chute.
Rio Tinto Aluminium Weipa – Infrastructure Life Extension Study
AEP Elical undertook the electrical, controls and communications work associated with the study to conduct a high-level condition assessment and then develop an order of magnitude estimate for capital expenditure for the electrical infrastructure.
BMA Peak Downs Flotation Concentrate Handling Capacity Increase
AEP Elical completed a preliminary design solution to increase the flotation concentrate handling capacity within the Peak Downs plant.
Nyrstar Engineering Services for Modifications to TSL Furnace Building
AEP Elical was engaged for the detailed design of a number of modifications to the newly commissioned TSL Furnace Building.
BHP BFX OD Asset Integrity and Maintenance Review
AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.
BHP OD MHS AI Structural Inspection
AEP Elical completed asset integrity review of the Material Handling System (MHS) for the BHP Olympic Dam mine.
Nyrstar Peer Review for Super Hopper Structural Upgrade
AEP Elical was engaged to provide a peer review of the design of proposed modifications to the supporting structure for the proposed new super hopper.
Challenger Gold Operations Electrical Safety Review
AEP Elical was engaged to perform electrical safety review and basic electrical field checks across the site to evaluate and report on site management and control for effective current safe systems on work.