BHP - Olympic Dam Brownfield Expansion : Integrated Instrument & Controls Study

AEP Elical developed a procedure for conducting a detailed audit of each legacy controller that BFX was likely to interface with. The review assessed attributes of the system that would potentially impact the performance of the system in achieving the BFX objectives, being nominally safe and the reliable productive performance for 20 years.