Mount Isa Mines Copper Smelter Condition Assessments

AEP Elical was engaged to undertake a structural inspection and condition report on the copper smelter crushing plant, a concept design to improve access to the bosh tank and a preliminary inspection of one of the two cooling towers.

AEP Elical deemed that the overall condition of the structure was good with no significant risks identified. ‘Red Dingo’ action sheets were prepared by AEP Elical for all notable defects found.

Previous
Previous

Challenger Gold Operations Electrical Safety Review

Next
Next

Glencore Mount Isa Mines Structural and Mechanical Audit