Nyrstar Slag Caster Frame Replacement

AEP Elical was engaged to undertake a concept study, followed by detailed design of structural modifications required to provide access for slag removal under the Slag Caster tail end support frame. As part of this project, AEP Elical undertook a structural integrity audit for the TSL Slag Caster Support Structure as well as additional scope in replacement of existing primary beam in the TSL plant and shedder plates to lengthen design life.