BMA Blackwater TCP TOM Grizzly Design

AEP Elical performed a structural audit on existing TPC ROM Hopper concrete structure and the capacity of the structure to accommodate the loading cases associated w/ ROM grizzly re-design (by AEP Elical also).

Previous
Previous

Black Rock Open Cut (BROC) Project Feasibility Study

Next
Next

BMA GCOS Asset Review - Goonyella/Riverside Site