AEP Elical successfully completed engineering design updates and verification of the ETAP Load Flow model for the electrical assets at MMG’s Rosebery copper mine.
AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.
This project included the upgrade of the lead smelting facility and introduction of the advanced metal recovery facility at Nyrstar's Port Pirie operations.