Home
About
Our Mission
Our People
Services
Overview
Asset Management
Digital Solutions
Due Diligence
Materials Handling
Minerals Processing
Power Generation
Power Systems
Safety
Water and Environmental
Projects
News and Insights
Contact
Office Location
Careers

AEP Elical

Home
About
Our Mission
Our People
Services
Overview
Asset Management
Digital Solutions
Due Diligence
Materials Handling
Minerals Processing
Power Generation
Power Systems
Safety
Water and Environmental
Projects
News and Insights
Contact
Office Location
Careers
November 27, 2020
Power Generation, Due Diligence
Mary-Anne Josefski
AEMO Ageing Coal-Fired Generation Reliability ...

AEP Elical recently supported AEMO, Australia’s Energy Market Operator, with an assessment of the reliability of the coal fired power stations in the National Electricity Market (NEM).

AEMO Ageing Coal-Fired Generation Reliability (NEM)
July 18, 2018
Asset Management, Minerals Processing
Mary-Anne Josefski
BHP BFX Asset Integrity and Maintenance Review

AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.

BHP BFX Asset Integrity and Maintenance Review
July 28, 2016
Materials Handling, Minerals Processing
Mary-Anne Josefski
Nyrstar Port Pirie Transformation Project

This project included the upgrade of the lead smelting facility and introduction of the advanced metal recovery facility at Nyrstar's Port Pirie operations.

Nyrstar Port Pirie Transformation Project
June 2, 2016
Minerals Processing
Mary-Anne Josefski
Black Rock Open Cut (BROC) Project Feasibility ...

Feasibility study into the relocation of assets to allow open cut development in the area.

Black Rock Open Cut (BROC) Project Feasibility Study
Mary-Anne Josefski
January 5, 2021
Due Diligence, Power Generation

Essential Energy Broken Hill Gas Turbine Due Diligence

Mary-Anne Josefski
January 5, 2021
Due Diligence, Power Generation

AEP Elical was appointed through Pricewaterhouse Coopers to provide Essential Energy with technical advisory services and an Independent Engineer’s report in support of the divestment of the Broken Hill gas turbine power plant.

Comment
Mary-Anne Josefski
November 27, 2020
Power Generation, Due Diligence

AEMO Ageing Coal-Fired Generation Reliability (NEM)

Mary-Anne Josefski
November 27, 2020
Power Generation, Due Diligence
AEMO Ageing Coal-Fired Generation Reliability (NEM)

AEP Elical recently supported AEMO, Australia’s Energy Market Operator, with an assessment of the reliability of the coal fired power stations in the National Electricity Market (NEM).

Comment
Mary-Anne Josefski
September 9, 2020
Safety

EDL Energy Hazardous Area Compliance

Mary-Anne Josefski
September 9, 2020
Safety
EDL Energy Hazardous Area Compliance

AEP Elical were engaged by EDL Energy to complete Hazardous Area Compliance work for EDL’s Wingfield 1 site.

Tagged: Safety, Hazardous Areas, Hazardous Area Verification Dossier, EDL

Comment
Mary-Anne Josefski
November 19, 2019
Asset Management

Rio Tinto Aluminium Weipa – Infrastructure Life Extension Study

Mary-Anne Josefski
November 19, 2019
Asset Management
Rio Tinto Aluminium Weipa – Infrastructure Life Extension Study

AEP Elical undertook the electrical, controls and communications work associated with the study to conduct a high-level condition assessment and then develop an order of magnitude estimate for capital expenditure for the electrical infrastructure.

Comment
Mary-Anne Josefski
November 14, 2019
Power Distribution, Power Generation

Loy Yang A Arc Flash Study

Mary-Anne Josefski
November 14, 2019
Power Distribution, Power Generation
Loy Yang A Arc Flash Study

AGL Energy had requested Elical to complete an Arc Flash Study for the Loy Yang 'A' Power Station; the largest power station in Victoria.

Tagged: arcflash, electrical, engineering, power, study

Comment
Mary-Anne Josefski
December 2, 2018
Materials Handling, Minerals Processing

BMA Peak Downs Flotation Concentrate Handling Capacity Increase

Mary-Anne Josefski
December 2, 2018
Materials Handling, Minerals Processing
BMA Peak Downs Flotation Concentrate Handling Capacity Increase

AEP Elical completed a preliminary design solution to increase the flotation concentrate handling capacity within the Peak Downs plant.

Comment
Mary-Anne Josefski
August 2, 2018
Minerals Processing

Nyrstar Engineering Services for Modifications to TSL Furnace Building

Mary-Anne Josefski
August 2, 2018
Minerals Processing
Nyrstar Engineering Services for  Modifications to TSL Furnace Building

AEP Elical was engaged for the detailed design of a number of modifications to the newly commissioned TSL Furnace Building.

Comment
Mary-Anne Josefski
July 18, 2018
Asset Management, Minerals Processing

BHP BFX Asset Integrity and Maintenance Review

Mary-Anne Josefski
July 18, 2018
Asset Management, Minerals Processing
BHP BFX Asset Integrity and Maintenance Review

AEP Elical undertook the Olympic Dam BFX project Asset Integrity & Maintenance Strategy study as planning component of the proposed $2.75 billion Brownfields Expansion.

Comment
Mary-Anne Josefski
May 18, 2018
Asset Management, Materials Handling

BHP OD MHS AI Structural Inspection

Mary-Anne Josefski
May 18, 2018
Asset Management, Materials Handling
BHP OD MHS AI Structural Inspection

AEP Elical completed asset integrity review of the Material Handling System (MHS) for the BHP Olympic Dam mine.

Comment
Mary-Anne Josefski
November 17, 2017
Power Distribution

QCoal Byerwen Power Supply Implementation

Mary-Anne Josefski
November 17, 2017
Power Distribution
QCoal Byerwen Power Supply Implementation

AEP Elical completed a High Voltage (HV) power supply concept design study which focused on the HV infrastructure as part of the QCoal Byerwen Project feasibility study.

Comment
Mary-Anne Josefski
July 28, 2017
Materials Handling

Nyrstar Peer Review for Super Hopper Structural Upgrade

Mary-Anne Josefski
July 28, 2017
Materials Handling
Nyrstar Peer Review for Super Hopper Structural Upgrade

AEP Elical was engaged to provide a peer review of the design of proposed modifications to the supporting structure for the proposed new super hopper.

Comment
Mary-Anne Josefski
June 2, 2017
Asset Management, Due Diligence

Challenger Gold Operations Electrical Safety Review

Mary-Anne Josefski
June 2, 2017
Asset Management, Due Diligence
Challenger Gold Operations Electrical Safety Review

AEP Elical was engaged to perform electrical safety review and basic electrical field checks across the site to evaluate and report on site management and control for effective current safe systems on work.

Comment
Mary-Anne Josefski
March 28, 2017
Asset Management

Mount Isa Mines Copper Smelter Condition Assessments

Mary-Anne Josefski
March 28, 2017
Asset Management
Mount Isa Mines Copper Smelter Condition Assessments

AEP Elical was engaged to undertake a structural inspection and condition report on the copper smelter crushing plant, a concept design to improve access to the bosh tank and a preliminary inspection of one of the two cooling towers.

Comment
Mary-Anne Josefski
February 17, 2017
Materials Handling

Glencore Mount Isa Mines Structural and Mechanical Audit

Mary-Anne Josefski
February 17, 2017
Materials Handling
Glencore Mount Isa Mines Structural and Mechanical Audit

AEP Elical was engaged to perform a structural and mechanical review of the headframe for the R62 Winder to determine the capacity of the headframe to withstand induced strains as a result of differential movement between the supporting legs.

Comment
Mary-Anne Josefski
February 2, 2017
Power Distribution

BHP HIMA Battery Replacement Upgrade Project

Mary-Anne Josefski
February 2, 2017
Power Distribution
BHP HIMA Battery Replacement Upgrade Project

AEP Elical was engaged to undertake a study to assess the requirements to increase battery backup capacity of uninterruptible power supplies associated with building safety services in the copper and uranium solvent extraction plants.

Comment
Mary-Anne Josefski
January 2, 2017
Materials Handling

CuDeco Rocklands Ore Feed System Engineering Support

Mary-Anne Josefski
January 2, 2017
Materials Handling
CuDeco Rocklands Ore Feed System Engineering Support

AEP Elical was engaged to investigate the tertiary crushed ore reclaim and feed arrangement and an alternate (bypass) system and to provide a concept design for an interim feed arrangement.

Comment
Mary-Anne Josefski
November 28, 2016
Power Distribution

MMG Rosebery Mine - ETAP Model Load Flow Update

Mary-Anne Josefski
November 28, 2016
Power Distribution
MMG Rosebery Mine - ETAP Model Load Flow Update

AEP Elical successfully completed engineering design updates and verification of the ETAP Load Flow model for the electrical assets at MMG’s Rosebery copper mine.

Comment
Mary-Anne Josefski
November 2, 2016
Power Distribution

Dyno Nobel Moranbah Arc Flash Study

Mary-Anne Josefski
November 2, 2016
Power Distribution
Dyno Nobel Moranbah Arc Flash Study

AEP Elical completed an Arc Flash Study for Dyno Nobel Plant in Moranbah for Incitec Pivot Limited.

Comment
Mary-Anne Josefski
October 2, 2016
Power Generation

GRA Emergency Backup Power Suppy Assessment

Mary-Anne Josefski
October 2, 2016
Power Generation
GRA Emergency Backup Power Suppy Assessment

AEP Elical was engaged to undertake a site inspection and concept design to provide emergency backup power generation at GRA Ceduna facility.

Comment
Mary-Anne Josefski
July 28, 2016
Materials Handling, Minerals Processing

Nyrstar Port Pirie Transformation Project

Mary-Anne Josefski
July 28, 2016
Materials Handling, Minerals Processing
Nyrstar Port Pirie Transformation Project

This project included the upgrade of the lead smelting facility and introduction of the advanced metal recovery facility at Nyrstar's Port Pirie operations.

Comment
Older Posts

Home| About | Services | Projects | Contact

99 Melbourne St, South Brisbane | Copyright AEP Elical 2019 | All Rights Reserved

ABN:  74 168 930 032

AEP Elical

Back to Top
AE Projects