Dyno Nobel Moranbah Arc Flash Study

AEP Elical completed an Arc Flash Study for Dyno Nobel Plant in Moranbah for Incitec Pivot Limited. This study reviewed all the arc flash points for the functional levels on each plant switchboard from 11kV down to 415V. AEP Elical gave advice on appropriate levels of PPE with respect to electrical operators operating and switching electrical equipment at the Dyno Nobel Moranbah site.